Are you interested in becoming an organizer in your area?
Yes
Tell us about your experience with alternative energy:
I worked in a mechanical windmill factory in my very first job after high school. (1979)
Studied Electronic Engineering in College.
And I've work primarily in the financial industry as a computer geek every since.
However, technology is one of my great interests.
What excites you about this campaign?
Many things.
1) A technological change as big as intercontinental railways
2) A restructuring of the wealth and political power formulas
3) A chance for our country to unify on a worthy cause
What do you want to do to help?
Speak publicly to help drive up awareness and to equip people with the knowledge and understanding they need in order to take real action.
Comment Wall (12 comments)
You need to be a member of PickensPlan to add comments!
Thought you might be interested in the Idaho National Laboratory facebook site. We do a lot of energy research including wind, nuclear, solar, natural gas, etc. http://www.facebook.com/idahonationallaboratory
Haven't been able to get a response from the pickens team on an idea. Maybe you have some pull some where. Assuming the new wind farm is on hold, why not setup a fund to add a windmill to an existing wind farm ? I would contribute to it. My original reason for joining was to increase the use of wind energy.
An article recently published:
http://www.biztimes.com/news/2009/2/6/innovations-racine-inventor-creates-a-better-windmill
At 8:37pm on February 17, 2009, Steven Nowak said…
Good intentions are not coupons that are redeemable at your local retailer.
Good results are not judged by you but by those that implement the results that need to be seen from you.
T.G.I.F. (Fridays) mission statement, "Effort without results is meaningless."
A good PP is not only what the army thinks but in addition, interaction of those that can be included globally with other armies out there.
The PP needs to understand how the Internet made our new President the President! They used active interactions through the Internet combining many groups and associations.
Yes, Andrew we are in Burlington. We also have a second plant in Genoa City, WI. You are more than welcome to come to visit our plants. I can show you some of the thing we have going. I will be available this week @ my office, phone # is 262-539-3811 & our web site is eco-tech.ws. Let my administative assistant know you are responding to me, or you will not get through.
Have a 1/2 complete biz plan for the completion of the prototype (need $180K to $200K to cover pressing debt & fully functioning prototype 72 ft tall w/40ft WIDE x 75ft TALL baffles), have transportable models and based off data from the partial 36 ft tall prototype, the 72 ft w/ 40ft wide system is expected to deliver 250Kw to 600Kw rating (at 36mph to 38mph). When are you available? My # is 262-308-7948
Hi Andrew--
Hope you are keeping safe & warm. Yosemite's Badger Pass is open for skiing with this latest snowstorm rolling through. Two weeks ago we were all in our shirtsleeves. I'm looking forward to getting more involved in the Pickens Plan as 2009 rolls in.
--Gary
Comment Wall (12 comments)
You need to be a member of PickensPlan to add comments!
Join PickensPlan
VIDEO of the very first design prototype:
http://www.youtube.com/watch?v=ZmUZJYYT2n0
An article recently published:
http://www.biztimes.com/news/2009/2/6/innovations-racine-inventor-creates-a-better-windmill
Good results are not judged by you but by those that implement the results that need to be seen from you.
T.G.I.F. (Fridays) mission statement, "Effort without results is meaningless."
A good PP is not only what the army thinks but in addition, interaction of those that can be included globally with other armies out there.
The PP needs to understand how the Internet made our new President the President! They used active interactions through the Internet combining many groups and associations.
I want the PP to succeed and the army to prosper.
Steven Nowak
262-679-0488
262-844-0524 cell
Have a 1/2 complete biz plan for the completion of the prototype (need $180K to $200K to cover pressing debt & fully functioning prototype 72 ft tall w/40ft WIDE x 75ft TALL baffles), have transportable models and based off data from the partial 36 ft tall prototype, the 72 ft w/ 40ft wide system is expected to deliver 250Kw to 600Kw rating (at 36mph to 38mph). When are you available? My # is 262-308-7948
Hope you are keeping safe & warm. Yosemite's Badger Pass is open for skiing with this latest snowstorm rolling through. Two weeks ago we were all in our shirtsleeves. I'm looking forward to getting more involved in the Pickens Plan as 2009 rolls in.
--Gary
View All Comments